Home › Commercial Demolition
Seattle · Eastside · Tacoma
Commercial Selective Demolition
FDC Construction provides selective commercial demolition and removal work for tenant improvements, remodels, repairs and defined construction scopes. Work is reviewed against the existing conditions, project documents and approved scope before demolition begins.
Licensed, bonded & insured
WA general contractor #FDCCOCL825QA
2-year workmanship warranty
Product and manufacturer warranties vary
Tukwila showroom
Mon–Fri 9–5 · Walk-ins welcome
Permits & inspections
Handled when required by applicable law and the approved scope
Commercial Demolition Services
Each demolition scope is confirmed in writing against the existing conditions and the approved project documents. Depending on the project, FDC Construction’s selective demolition work can include:
Selective interior demolition
Removal of interior components where required by the approved remodel, tenant-improvement or repair scope.
Wall, ceiling & finish removal
Selective removal of non-structural partitions, ceilings, flooring and finish materials where included in the project scope.
Cabinetry & fixture removal
Removal of cabinetry, fixtures and related interior components where required for the approved construction work.
Demolition for tenant improvements
Selective demolition coordinated with the new layout, framing and building-system work required for a tenant-improvement project.
Repair & reconstruction demolition
Selective removal needed to expose damaged conditions or prepare an area for approved repair/reconstruction work.
Before Demolition Begins
Selective demolition is planned before any removal starts. Depending on the project, that planning covers:
01 Existing-condition review
Review the areas to be removed, adjacent finishes and access conditions before finalizing the demolition scope.
02 Scope verification
Confirm exactly what is removed, what remains and how the demolition ties into the approved construction scope.
03 Utility coordination
Identify plumbing, electrical, HVAC or other systems that may be affected and coordinate required shutoffs or trade work.
04 Protection of remaining areas
Where demolition occurs beside work that remains, protection and separation measures are planned according to the project conditions.
05 Structural review where required
Where walls, openings or structural components are affected, coordinate the demolition with the approved structural requirements.
06 Debris handling
Demolition debris and disposal requirements are addressed according to the approved project scope and applicable project requirements.
The written scope defines the work. What is removed, what remains and how the demolition ties into the rest of the project are confirmed in writing before demolition begins.
Structural & hazardous-material boundaries
Structural components
Where walls, openings or structural components are affected, demolition is coordinated with the approved structural design and project requirements before work proceeds. FDC can provide full-service design coordination, including architectural and engineering services through qualified professionals when required by the project. FDC coordinates that work; the architectural and engineering services themselves are provided by those professionals.
Hazardous materials
Before affected demolition begins, the project must address applicable asbestos or other regulated hazardous-material survey, notification and abatement requirements. Required regulated abatement is performed by appropriately qualified or certified professionals. FDC’s written scope identifies the demolition work included in the project.
Regulated asbestos or hazardous-material abatement is not included in FDC’s Commercial Demolition scope unless separately documented and approved.
Selective demolition as part of a larger project
Selective demolition is often the first construction phase of a larger tenant improvement or commercial remodel. The removal work is planned around the new layout, framing and building-system work that follows, so it is scoped together with the rest of the project.
How a commercial demolition scope works
1
Site & scope review
Review the space, the areas to be removed, access conditions and the project goals.
2
Plans / existing-condition coordination
Compare the existing conditions with the approved plans and confirm what is removed and what remains.
3
Permits, surveys & preconstruction requirements
Identify the permits, surveys and approvals the scope requires. Affected demolition does not begin until they are in place.
4
Protection & selective demolition
Protect the areas that remain, coordinate required shutoffs, then remove the components included in the approved scope.
5
Debris removal & preparation for reconstruction
Remove demolition debris as defined in the scope and prepare the area for the next phase of work.
6
Inspection / turnover to the next construction phase
Complete any required inspections and turn the area over to the next phase of the approved project.
Permits and inspections are specified in the project scope and handled by FDC Construction when required by applicable law and the approved scope of work.
Commercial Demolition FAQs
What type of commercial demolition does FDC handle?
FDC focuses on selective demolition and removal work for commercial remodeling, tenant improvements, repairs and other defined construction scopes. The exact demolition work is confirmed after reviewing the existing conditions and approved project documents.
Do you perform full-building demolition?
Full-building demolition is not presented as a standard FDC Construction service. We review each requested demolition scope individually and confirm in writing what work FDC will perform.
Can you remove walls and interior partitions?
Selective wall and partition removal can be included where it is part of the approved project scope. If structural components may be affected, the work is coordinated with the required structural design and project requirements before demolition proceeds.
Do you handle asbestos or hazardous-material removal?
Before affected demolition begins, the project must address applicable asbestos or other regulated hazardous-material survey, notification and abatement requirements. Required regulated abatement is performed by appropriately qualified or certified professionals. FDC’s written scope identifies the demolition work included in the project. Regulated asbestos or hazardous-material abatement is not included in FDC’s Commercial Demolition scope unless separately documented and approved.
Can demolition be part of a tenant improvement or remodel?
Yes. Selective demolition is often coordinated as the first construction phase of a tenant improvement or commercial remodel, followed by the approved framing, building-system and finish work.
Who handles permits and inspections?
Permit and inspection requirements depend on the project scope and jurisdiction. They are identified in the project scope and handled by FDC Construction when required by applicable law and the approved scope of work.
Commercial Demolition Service Areas
Serving Seattle, Kirkland, Bellevue, Redmond, Mercer Island, Tacoma, the Eastside, King, Pierce and Snohomish counties, plus Gig Harbor, Bremerton, Silverdale and Bainbridge Island.
Seattle · Bellevue · Kirkland · Issaquah · Mercer Island · Newcastle · Tukwila · Normandy Park · Maple Valley · Covington · Tacoma · Puyallup · Bonney Lake · Gig Harbor · Bainbridge Island
Planning a Commercial Demolition Scope?
Tell us what needs to be removed, what is staying, and how the demolition fits into the larger project. Upload plans, photos or project documents for review.