Home › For GCs

Seattle · Eastside · Tacoma · Licensed WA general contractor #FDCCOCL825QA

Subcontractor Services for General Contractors

Tile and selected trade packages for general contractors and restoration contractors in the Seattle–Tacoma area.

Depending on the scope, FDC can price labor-only or furnish-and-install trade packages.

Full Name *
Phone Number *
Email Address *
Project Address *
Project Type *
Project Description
Project photos or plans (optional)
Maximum file size: 10 MB
Optional: add photos or plans of your project (up to 5 files: JPG, PNG, HEIC or PDF, 10 MB each).
Consent Opt In

Licensed, bonded & insured
WA general contractor #FDCCOCL825QA

W-9 available
For vendor and prequalification setup

Certificate of insurance
Available on request

Tukwila office & showroom
374 Upland Dr · Mon–Fri 9–5

Trade scopes for general contractors

Tile installation is FDC Construction’s primary subcontract trade. Restoration and reconstruction scopes are the second recurring category. Brick/masonry and painting/repair scopes are available on selected projects.

PRIMARY SUBCONTRACT TRADE

Tile installation

Scopes include:

  • floor tile and wall tile
  • tile base
  • restroom tile
  • shower and niche tile where part of the subcontract scope

Labor-only or furnish-and-install, where the project documents support it.

RECURRING SCOPE

Restoration & reconstruction scopes

The second recurring category of FDC’s subcontract work: selected repair and reconstruction scopes for restoration contractors, priced from the contractor’s scope of work for each job.

Selected scopes — available on some projects where they fit the subcontract package:

SELECTED SCOPE

Brick & masonry repair

Brick and masonry repair / rebuild scopes, priced from the drawings and the existing conditions.

SELECTED SCOPE

Painting & repair scopes

Painting and repair scopes where included in the subcontract package.

Labor-only and furnish-and-install pricing may be available depending on the trade and project scope.

Commercial and residential contractor support

Commercial GC support

Trade packages for retail store build-outs and commercial renovation projects, priced from the general contractor’s drawings, specifications and bid requirements.

Night or after-hours work where the project specifically requires it and it is agreed in advance. FDC works with standard GC paperwork, including W-9 and insurance documents, pay applications, lien waivers and closeout documents, as each subcontract requires.

Residential & restoration contractor support

FDC has completed subcontract work for restoration and reconstruction contractors, and for design firms acting as the prime contractor on residential projects. Scheduling and site access are coordinated through the contractor’s project manager.

Verified subcontract experience

Examples of completed subcontract work. Contractor, tenant and owner names are not published.

Retail store build-out — Tukwila, 2026

Tile and tile-base subcontract under a retail general contractor, including after-hours work and standard closeout paperwork.

Building renovation — Seattle, 2023

Brick wall repair/rebuild and tile work performed under a master subcontract.

Healthcare facility — Auburn, 2023

Restroom wall tile performed as a sub-tier labor scope.

Restoration contractor projects — Seattle area, 2024–2026

Selected reconstruction and tile-related scopes completed under subcontract agreements.

How FDC works with a general contractor

We price from the drawings, specifications and scope provided for the project.

01  Invitation, plans & specifications
We review the invitation to bid, the drawings, the specifications and the bid requirements for the scope.

02  Scope & quantity review
We check the scope, quantities, materials and schedule shown in the project documents.

03  RFIs & scope clarification
Questions or gaps in the documents are raised with the GC before the price is finalized.

04  Written pricing
A written price for the reviewed scope, on a labor-only or furnish-and-install basis where applicable.

05  W-9, COI & prequalification
W-9 and certificate of insurance on request. Send your prequalification or vendor packet for review.

06  Schedule & site access
Start dates, work hours and site access are coordinated with the GC’s superintendent or project manager.

07  Pay applications & lien waivers
Billing follows the subcontract, including pay applications and lien waivers where required.

08  Punch list & closeout
Punch-list items are completed and closeout documents are provided as the subcontract requires.

Paperwork follows the subcontract. Billing format, waivers and closeout documents depend on each general contractor’s requirements.

Glass, storefront, windows and doors

Glass, storefront, windows and door packages can be coordinated through FDC Glass Group, a separate FDC company specializing in glass, windows and doors.

Questions from general contractors

What trades does FDC offer to general contractors?

Tile installation is FDC’s primary subcontract trade: floor, wall and restroom tile, tile base, and shower and niche tile where it is part of the subcontract scope. Restoration and reconstruction scopes for restoration contractors are the second recurring category. Brick and masonry repair / rebuild scopes and painting and repair scopes are available on selected projects where included in the subcontract package.

Do you provide labor-only pricing?

Depending on the scope, FDC can price labor-only or furnish-and-install trade packages. Not every trade is offered both ways; the basis of the price is stated in the written quote.

What do you need to price a subcontract scope?

The drawings, specifications, scope of work, schedule and bid requirements, including the bid due date. Plans and documents can be uploaded with the request form. We price from the drawings, specifications and scope provided for the project.

Can you provide W-9 and insurance documents?

Yes. A W-9 and a certificate of insurance are available on request. If your company uses a prequalification or vendor packet, send it with the invitation and we will review the requirements.

Can you work after hours or in occupied commercial spaces?

Where a project specifically requires night or after-hours work, it can be discussed during pricing and, if agreed, scheduled with the GC. Work in occupied spaces follows the GC’s site rules and schedule. After-hours availability is confirmed project by project.

Do you provide storefront, glass, windows or door packages?

Glass, storefront, windows and door packages can be coordinated through FDC Glass Group, a separate FDC company specializing in glass, windows and doors. They are not part of FDC Construction’s subcontract trade scopes.

Service area

Serving Seattle, Kirkland, Bellevue, Redmond, Mercer Island, Tacoma, the Eastside, King, Pierce and Snohomish counties, plus Gig Harbor, Bremerton, Silverdale and Bainbridge Island.

Have plans or a subcontract scope to price?

Send the drawings, specifications, scope and bid requirements for review.