Flooring Installation & Replacement in Covington, WA
FDC Construction installs and replaces residential flooring as part of remodels and standalone flooring scopes, with floor preparation, subfloor conditions and transitions reviewed according to the existing conditions and approved scope.
Licensed, bonded & insured
WA general contractor #FDCCOCL825QA
2-year workmanship warranty
Product and manufacturer warranties vary
Tukwila showroom
Mon–Fri 9–5 · Walk-ins welcome
Permits & inspections
Handled when required by applicable law and the approved scope
Flooring Installation & Replacement Services
LVP & resilient flooring
Installation and replacement of resilient plank flooring where included in the approved project scope.
Wood flooring & stair treads
Wood flooring and stair-tread work coordinated according to the selected flooring system and approved project scope.
Flooring replacement
Removal and replacement of existing flooring where appropriate for the project.
Subfloor & floor preparation
Subfloor conditions, preparation and required repairs reviewed before finished flooring installation.
Depending on the flooring system and project scope, installation may be completed by FDC crews or coordinated with qualified trade partners.
Flooring Installation & Replacement in Covington
FDC Construction reviews each flooring project based on the existing floors, subfloor conditions, selected flooring system, transitions and approved scope. Removal, preparation, repairs and installation are coordinated according to the project requirements.
Example FDC Flooring Work
These photos show completed FDC Construction flooring work from other projects and are included as examples of scope and finish.
Engineered Wood Flooring — Full-House Renovation
FDC example work
Engineered wood flooring installed as part of an FDC full-house renovation.


Stair Tread Before & After
FDC example work
Stair tread replacement — before and after.


What Happens Before Flooring Is Installed
Preparation is reviewed before the finished flooring goes in. Depending on the project, that review covers:
01 Existing-floor removal
Where replacement is part of the scope, existing flooring is removed as required for the new installation.
02 Subfloor inspection
After removal, accessible subfloor conditions are reviewed for damage, movement or other issues that may affect the installation.
03 Floor preparation
Preparation requirements depend on the existing conditions and selected flooring system.
04 Leveling when required
Additional leveling or self-leveling work is included only when specified in the approved scope or added after the existing conditions are reviewed.
05 Transitions & adjacent finishes
Transitions between flooring types, stairs and adjacent rooms are reviewed as part of the finish plan.
Floor preparation depends on the existing conditions and selected flooring system. Additional leveling, subfloor repair or preparation outside the agreed scope is reviewed and documented before proceeding.
How a flooring project works
1
Site & existing-condition review
Review the rooms, existing flooring, access and project goals.
2
Material & scope confirmation
Confirm the selected flooring, areas included, transitions and finish details.
3
Removal & preparation
Remove existing flooring where included and prepare the substrate according to the approved scope.
4
Repairs, leveling & flooring installation
Address approved repairs or leveling based on the revealed conditions, then install the selected flooring according to the approved layout and applicable product requirements.
5
Transitions, trim & final walkthrough
Complete included transitions and trim, protect finished work as appropriate and review the completed scope.
Flooring questions
What types of flooring does FDC install?
FDC Construction installs LVP and other resilient plank flooring and replaces existing flooring where included in the approved project scope. Engineered and other wood flooring and stair-tread work can be coordinated according to the selected flooring system and approved project scope. Depending on the flooring system and project scope, installation may be completed by FDC crews or coordinated with qualified trade partners.
Can you replace existing flooring?
Yes, where removal and replacement are included in the approved project scope. Existing flooring is removed as required for the new installation, and the conditions found after removal are reviewed before the new flooring is installed.
Do you repair subfloors?
Accessible subfloor conditions are reviewed after flooring removal. Repairs outside the agreed scope are discussed and documented before proceeding.
Is floor leveling included?
Floor preparation depends on the existing conditions and selected flooring system. Additional leveling or self-leveling is included only when specified in the approved scope or added after conditions are reviewed.
Can flooring be installed as part of a larger remodel?
Yes. Flooring can be coordinated with kitchen, bathroom and whole-home remodeling schedules as part of the approved project scope.
What warranty does FDC provide?
FDC Construction provides a 2-year workmanship warranty. Product and manufacturer warranties vary by material and product.
Eligible FDC Construction projects may qualify for the in-house 0% APR payment plan up to $50,000, subject to approval and written terms.
OUR SHOWROOM
Visit Our Tukwila Showroom
Meet the FDC Construction team at our Tukwila showroom. Open Monday–Friday, 9:00 AM–5:00 PM. Walk-ins welcome.
FDC Construction showroom
374 Upland Dr #1st, Tukwila, WA 98188
Mon–Fri 9–5 · Walk-ins welcome
Planning a Flooring Project in Covington?
Tell us what flooring you’re considering and upload photos, plans or existing-condition images for review.